Shawes Bay Hotel
New Age electrical have been awarded the electrical package for the Shawes Bay Hotel
Full rough in is underway ready for completion within the next coming months.
The Renovation to the Hotel located in Ballina will include:
-Upgraded power to site
-Supply and installation of new main switchboard and distribution boards
-Full lighting and power upgrade to venue
-Including incorporation of control 4 smart lighting


Kingscliff TAFE
New Age electrical were awarded the electrical package for the 2 new buildings being built at Kingscliff TAFE
The works comprised of :
-
Two new TAFE buildings
-
Co-ordination with Level 1 contractor for the installation of new pad mount sub-station
-
Supply and installation of new consumer mains
-
Design and installation of new main switchboard
-
Relocation of existing site services
-
Various site lighting upgrades top campus
-
Reticulation works for new fire pump station
Kool Beanz Suffolk park
-
This new childcare centre is underway with the first layer of concrete just been poured
-
New Age has completed the installation of all conduit into the first level slab
-
Focus is now on the installation of new mains to site and installation of temp builders power to each level.

Byron community hub
-
This project has reached completion
-
Handed over the beginning of July 2024
-
This project consisted of the complete revamp of more than half the existing hospital site.
-
Including upgrade to consumer mains and installation of Private pillar.
-
New main switchboard and supply and installation of 11 tenancy distribution boards.
-
With a fully integrated security system including access control and alarm system
The team at New Age worked closely with Blaze Projects to help deliver a 5 star finish.
Changing the design to incorporate automation where required we helped to re-design and apply simplicity and elegance to all the feature lighting throughout the project.

Magnolia

This house was completed back end of 2024 for Rod Sironen Constructions
The home comprised of extensive amounts of feature lighting all integrated in the SAL pixie smart automation system.
The footprint of the house being just under 1000m2
New Age Electrical were awarded the full electrical package and delivered the project on time and to the highest standard as always.